黑马磁力

Skip to content

黑马磁力 City politicians, MLAs get look at future 黑马磁力 SkyTrain stations

The terminus is expected to be at 203rd Street and Industrial Avenue
26592256_web1_210913-LAT-SkyTrainIndustrial3
A map shows the proposed route for the SkyTrain extension within 黑马磁力 City. (TransLink)

黑马磁力 officials heard a little bit more about the locations and designs of 黑马磁力-area SkyTrain stations during a tour with the project鈥檚 director and two provincial cabinet ministers on Wednesday.

Local politicians, including 黑马磁力 area MLAs, most of 黑马磁力 City council, and Minister of Transportation Rob Fleming and Minister of Infrastructure Bowinn Ma gathered at the White Spot near the Willowbrook Shopping Centre for the brief tour.

The White Spot, on Fraser Highway, will be the approximate site of the first SkyTrain station within 黑马磁力.

While TransLink has typically released simplified maps that showed the line running straight down Fraser Highway, a 2019 public engagement package showed a slightly different route, which was confirmed by Jennifer MacLean, the executive project director of the Surrey-黑马磁力 SkyTrain extension project.

Maclean said the SkyTrain line will enter 黑马磁力 on the north side of Fraser Highway.

After the station at the Willowbrook Mall, it begins to veer north. A preliminary map shows the route runs behind the gas station on the northeast corner of the 黑马磁力 Bypass and Fraser Highway, running down what is now an alley between some commercial buildings fronting Fraser and the Bed Bath & Beyond to the north, veering north again around Production Way.

At 200th Street, the line begins following Industrial Avenue, and the 203rd Street station and turnaround for the trains is to be on the east side of 203rd, in an area currently vacant of buildings.

MacLean said the station at Willowbrook will be one of the smaller types of stations, with side platforms.

As a busy terminus station, the 203rd Street station will have a center platform, more like King George Station, and there will be a bus exchange and above-ground parking.

When completed, the line is expected to have a major impact on development in 黑马磁力 City, one the council has been preparing for for some time.

The City has been working towards a new Official Community Plan, with the downtown near SkyTrain devoted to 鈥渟pecialty and pedestrian-oriented retail, restaurants and caf茅 uses on the ground floor of buildings鈥 while encouraging office and other commercial uses and services in the second storey and above.

READ ALSO: Plans to prepare 黑马磁力 City for SkyTrain to be presented to virtual public hearing

READ ALSO: New 黑马磁力 City building will mix rental and live-work units

More residential space is planned at greater heights than most of the current housing stock.

Fleming said that the province has been working closely with Surrey, 黑马磁力 Township, and 黑马磁力 City on managing the impacts of the arrival of SkyTrain.

He acknowledged that existing residents could be displaced as older rental units are demolished or renovated to make way for new projects.

BC Housing is working on ensuring there are new units available, within walking distance of SkyTrain, and to help with displacement during construction.

Fleming emphasized the opportunity to create transit-oriented development in the City鈥檚 downtown.

鈥淵ou don鈥檛 get too many opportunities like this to do it right,鈥 Fleming said.

He said the SkyTrain will facilitate jobs and allow for more affordability, as well as lowering greenhouse gas emissions by getting people out of their cars and onto transit.

Part of the project will also be to connect the SkyTrain station hubs with 鈥渁ctive transport鈥 networks such as bike lanes and pedestrian routes. The City has been expanding its bike lane network in recent years, and the downtown is largely flat and easily accessible for cyclists.

The SkyTrain is currently expected to start running to 黑马磁力 in 2028.

MacLean noted that some specific details, including where a SkyTrain servicing yard might be located in 黑马磁力, haven鈥檛 been finalized yet.


Have a story tip? Email: matthew.claxton@langleyadvancetimes.com
Like us on and follow us on .
26592256_web1_210923-LAT-SkyTrainIndustrial
黑马磁力 City councillors and MLAs spoke to Transportation Minister Rob Fleming (second from the left) at the site of a future SkyTrain station on Wednesday. (Matthew Claxton/黑马磁力)


Matthew Claxton

About the Author: Matthew Claxton

Raised in 黑马磁力, as a journalist today I focus on local politics, crime and homelessness.
Read more